01
Enquiries, technical responses and tendering
Requirements are spread across emails, drawings, investigation files and tender clauses.
Explore details
ECC / BATUMI, GEORGIA
ECC plans to validate Artificial Intelligence (AI) for document retrieval, data processing and content preparation. Start with authorised source files, access rules and human review, then connect proven methods to everyday systems.
Enquiry → investigation and drawings → clarifications → technical and tender drafts → materials and equipment → construction coordination → inspection records → reports and handover → knowledge archive.
01
Requirements are spread across emails, drawings, investigation files and tender clauses.
Explore details02
An area may have several drawings, revisions, specifications and email instructions. File names alone cannot establish the current version.
Explore details03
Boreholes, strata, groundwater and tests arrive in scans and tables with differing units, depths and sampling locations.
Explore details04
Copying an old method can introduce wrong parameters, obsolete clauses or unsuitable site assumptions.
Explore details05
Drilling, grouting, batches, equipment and site changes generate scattered photos, voice notes and tables every day.
Explore details06
Unlinked inspection sheets, corrective-action photos and reviews make closure difficult to verify. HSE means Health, Safety and Environment.
Explore details07
Specifications, equipment suitability, transport and site windows depend on each other; suppliers describe items and lead times differently.
Explore details08
Separate time, procurement, equipment, material and progress records hide how waiting and variations affect the plan.
Explore details09
The same engineering facts must become client emails, minutes, tender notes, reports and website stories in KA, EN and TR.
Explore details10
Methods, common questions and handover experience can be hard to find without a colleague who knows the files.
Explore details11
Documents, models, business systems and access rules need a controlled technical architecture.
Explore detailsPHASE 01
Define classification, numbering, access and review rules, then test feasibility in a limited set of scenarios.
PHASE 02
Expand validated use cases while improving data governance, model evaluation, permissions and human review.
PHASE 03
Consider external document processing, inference or hosted services only after business need, authorisation, validation and compliance conditions are met.