ECC / BATUMI, GEORGIA
Grouting
We organise grouting solutions for ground strengthening, void filling and seepage control. Materials, methods and parameters follow trials, design and site feedback.
Project basis
Project trials · Site feedback
Our agreed scope follows investigation data, design requirements, groundwater, available space, neighbouring structures and contractual responsibilities. Engineering parameters and final technical decisions are confirmed by qualified professionals with the relevant responsibilities.

Scope of work
Solution planning · Implementation workflow
Organise treatment zones and work sequences, coordinate materials and equipment, and consolidate construction, test and exception records for professional review using agreed formats.
Records and handover
Material and batch information, construction and test records, exception reports and stage summaries. Records support professional review.
Information to start
Please share the project location, design and construction stage, investigation and test data, drawings, nearby structures, site access, planned schedule and support required.